Colocation Overview
Power
10
Commissioned Power
N/A
Available Power
25
Under Construction Power
95
Planned Power
- Estimated Power Cost ($/kWh) 0.051
- On-Site SubstationYes
- Power ProviderRocky Mountain Power
Building
550,000
Building Size
1
Max Raised Floor Height
Built 1976, Renovated 2017
Year Built
Fiber
CenturyLink
Zayo
Cogent
Comcast
FirstDigital Telecom
Lumen
PacketFabric
Verizon
Colocation Specification
Infrastructure
- UPS Redundancy2N
- Generator RedundancyN+1
- Cooling RedundancyN, N+1, 2N
Connectivity
Dual Entrances
Carrier Neutral
IX
Compliance
SSAE-16
HIPAA
PCI
LEED
DIACAP
Energy Star
ISO
FISMA
GSA ISC
FEDRAMP
LEED Silver
LEED Gold
LEED Platinum
NIST
SAS 70
SOC 1
SOC 2
SOC 3
SOX
Services
Colocation
Cabinets
Cages
Private Suites
Dedicated Infrastructure
Cloud
Managed Hosting
Managed Services
Internet Exchange
Security
24/7/365 Security
Perimeter Fencing
Card Key Access
Biometrics Scanners
CCTV
Man Trap
Certifications
Uptime Institute MO Site Award
Uptime Institute Tier III Constructed
Uptime Institute Tier III Design
US EU Safe Harbor
Open IX Certification
About the facility
Overview
Aligned Energy continues to demonstrate the ability to deliver commissioned space within 90 days of contract. Having filled its Phase I, Aligned continues with constructions efforts on the next 84,000 square feet and 20 MWs of shell in its east wing of available expansion space, with 120-day delivery to fully commissioned space.
Nearby Facilities
We found 5 facilities near Aligned Energy SLC01 -SLC02